Ready-mix concrete · Class B22.5

M300 concrete

M300 is the most widely used, all-round grade: monolithic foundations, walls, floor slabs, columns and stairs.

Class B22.505 / 07

M300

Strength
Used for

The most widely used grade: monolithic foundations, walls, slabs, columns and stairs.

01Used for

What M300 is used for

  • Monolithic foundations and slabs
  • Floor slabs and monolithic walls
  • Columns and stairs
  • Yards and parking areas

A frame carrying very heavy loads takes M350–M400. M250M350

What grade M300 means

M300 is concrete with an average compressive strength of about 300 kgf/cm². Class B22.5 means a guaranteed strength of 22.5 MPa.

02Why order from us

  • 01

    By recipe

    Every cubic metre is made by the grade’s own recipe.

  • 02

    On time

    We plan the trucks for the time you name.

  • 03

    Your truck on the map

    Follow the truck live from the plant to your site.

  • 04

    Pay for what you got

    You are charged after delivery, all in one statement.

03Ordering

How to order

  1. 01

    Call or write

    By phone, in the Telegram bot or at app.j-beton.uz: grade, volume, site and time.

  2. 02

    We confirm

    We call back to confirm and plan the trucks for your time.

  3. 03

    You receive it

    Follow the truck on the map, then confirm its arrival and the concrete you received.

05FAQ

Frequently asked questions

Questions and answers

How do I order concrete?

Call the plant, write to our Telegram bot or sign in at app.j-beton.uz. Tell us the grade, volume, site, date and time, and we will call back to confirm.

Which grade do I need?

M100–M150 for blinding layers, footpaths and light work; M200–M250 for low-rise foundations and stairs; M300 for monolithic foundations, walls and floor slabs; M350–M400 for load-bearing frames and special structures.

How do I follow the truck?

When the truck leaves the plant you get a message in Telegram. From then on you see it on the map, with its estimated arrival time, until it reaches your site.

How do I pay?

You are charged once the concrete is delivered, so you pay for what you received. All deliveries and payments are in your company’s single statement, which you can open in Telegram at any time.

06Contact

Tell us the grade, volume, site and time: we will call back to confirm and plan the trucks.

Questions and answers

Request

Leave a request

Leave your name and phone, and we will call you.

To send a request, turn on JavaScript in your browser. Or call us, or write to our Telegram bot.